| PROJECT | Construction of 5 storey head office building situated at 199, Kew Road, Colombo 02 |
| CLIENT | Chemical Industries Colombo Ltd |
| PROJECT DURATION | 15 Months |
| PROJECT COST | Rs. 60 Million |
| PROJECT STATUS | Completed in June 1993 |
| ARCHITECTS & STRUCTURAL ENGINEERS | Selveratnam & Perera |
| SPECIALISED CONSULTANTS | Electrical – Engineering & Industrial Consultants Fire Protection& Detection System – Wing Commander CAO Dirckze |
| MAIN CONTRACTORS | Union construction Engineering |
| SPECIALISED CONTRACTORS | Electrical and Fire Protection & Detection System Fentons Air Conditioning System International Trading Co. Ltd Generator Kool Air Ltd Lift ETA Melco Communication Equipment Adelphi Electronics Interior Design Wijeya Associates Interior Design A T Cooray Road Works S M D Gunaratne Sound Proofing Allied Engineering |
| BACK GROUND | The service of a Project Manager was requested by the Client to Co-ordinate the service of the various Consultants & Contractors and also to effectively administer a project cost control system in order to complete the project within the A resident Site Engineer was appointed by LAN to supervise the day to day activities and monitor quality of work carried out stipulated time and cost targets |
| SERVICE |
|